CPD Seminars presented by Armstrong

HVAC System Circuit Balancing

This module discusses the practice of system balancing including the proportional balancing method and addresses the importance of a correctly balanced system. The subject also looks at the desirable qualities of commissioning devices such as valves and orifice plates with respect to installed cost, system efficiency and life cycle cost reduction.

Agenda :-

Introduction   What is HVAC system balancing?
Proportional balancing method    
Desirable equipment qualities   Commissioning valves, orifice plates, manometers etc
Armstrong value propositions   Step by step commissioning method

Key Learning Outcomes include :-

- The importance of system balancing on occupancy comfort and building tenant longevity
- Opportunities to reduce system installed cost & life cycle cost
- How installing high quality commissioning valves reduce project risk

| Request CPD Technical Presentation |

 

| Building Design Home | Request informationArchitectural CPD Seminars | HVAC CPD Seminars | Electrical CPD Seminars |
| Architectural Technical Pages Index | Electrical Technical Pages Index | Mechanical Technical Index | Discussion Help | News |

| F1 | F2 | F3 | F4 | F5 | A1 | A2 | A3 | A4 | A5 | Architectural Products | HVAC Products | Electrical Products | Terms of Use |

Useful building design and construction links - | Links Directory |





Recruitment -

| Architect Jobs | Electrical Engineer Jobs | Building Engineering Jobs | AutoCad Operator Jobs | Structural Engineer Jobs | Links |

Email      

Arundel Jones Associates LLP Tel : 01622 745333 Fax : 01622 746444