- BuildingDesign Construction Portal

2018 Electrical Notebook Questionnaire

*Name: *Company: *Telephone: *Email:
*Address:
  • Step 1
  • Please register my interest in receiving my FREE copy of the 27th edition Electrical Engineers’ Notebook by opting in here

  • A) This will require one phone call from BuildingDesign to validate postal address for notebook delivery in May 2018
    B) One postal questionnaire in April 2019 to ascertain whether a 2019 copy is required.
  • Step 2
  • Please indicate any updated Manufacturers’ Catalogues required and identify projects on which you have either contacted, nominated, alternatively specified or directly purchased products associated with the following companies, related to the use of your 2017-2018 Electrical Engineers' Notebook.
Cat Request Sponsor Subject Project Name Project Name Project Name
LV Switchgear/Motor Control Systems
Emergency Lighting / Fire Detection
Lighting & Transient Protection
Cable Protection & Management Systems
Power Factor Correction Solutions
Cable Management Systems
Generators / In-House Design & Build
Large Projects & Bespoke Solutions
Total Fire Solutions
Leak Detection Systems
Power Generation & Control
Energy Management / Smart Buildings
Wiring Accessories / Circuit Protection
LV Control & Distribution
MV Control & Distribution
Power Generation
Renewable Energy Efficient Heating
Busbars / Underfloor Busbars

Energy Saving Lighting

Cable Management / Underfloor Busbars
Emergency Lighting Systems
Static UPS
Cast-Resin Insulated Busbars
Dynamic UPS & Generators Sets
MV / LV Switchboards & UPS
ACBs / MCCBs / Power Electronics
Fire Detection & Alarm Systems
Battery-less Dynamic Diesel UPS
Security Solutions
Power Generation Products
Cable Management
Transformers / Power Distribution
Commercial / Domestic Lighting
Cable Management
Building & Energy Management
Overvoltage / Surge Protection
Fire Performance & Power Cables
Electrical U/F Heating / Surface Snow Melting
Leak Detection
Critical Power Module (CPM)
Rotary UPS
DeRUPS™ Solution
Power Factor Correction Equipment
Switchgear / Critical Systems
Cable & Pipe Sealing Solutions
LV / MV Control & Distribution
Metering & Monitoring
Energy Monitoring / Meter Supply
Fire Safety & Security
UPS / Energy Storage
Switchgear / Metering / Power Quality
Generators / Loadbanks / Switchgear
Lighting Control Systems
Cable Management Solutions
Rapid Installation Systems
Static UPS
Emergency Lighting Systems
Structured Cabling / Modular Wiring
  • Step 3
  • Please identify any NEW projects being designed over the next 12 months and indicate approximate tender date.
Project Name Type (eg education, retail, commercial, etc) Approx. Value Approx. Tender Date

We will never sell or share your name/Company details to any 3rd parties, other that advising the 64 sponsors of this scheme to demonstrate the successful distribution of the Notebook and effectiveness of this publication in promoting their products and services. (You may leave any box blank.)
  • I agree to being contacted by Phone
  • I agree to being contacted by Post
  • I agree to being contacted by Email

Our Privacy Policy can be found here »

*Enter numbers shown for validation