CPD Seminars presented by Ardex

Screeding, Levelling & Sub-Floor Preparation
(45 minutes)
Design and technical requirements of cement and sand screed
installation
Includes advice on rapid hardening and rapid drying screeds
Information on recommended methods of mixing and application
Methods and techniques used to prepare sub-floors
A wide range of situations covered including pumped application, wear resistant
screeds and rapid sub-floor repairs