M25 Disaster

M25 Disaster Recovery Site

Problem: The disaster recovery centre rarely utilised the 800kW cooling chillers leading to maintenance and reliability problems from operating below the minimum load requirements.

Solution: A 2500 litre buffer tank and a 150kW Uniflair packaged free-cooling chiller were installed, which were more suitably sized for the centre's base load. The results show a 34% daily energy saving, equating to an annual saving of over £22,000.