- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

Mitsubishi Electric - Commercial Heating Case Studies

Click on the links below to read more information about a case study:

Brynhoffnant Primary School case study

Brynhoffnant Primary School

The school's new system incorporates five CHQ-P300YHM-A ground source heat pumps connected to a closed loop geothermal system.

Chapelford primary school case study

Chapelford Primary School, Warrington

Mr Slim units supply cooling to the school’s offices using the ozone-friendly refrigerant R410A.

HuntersGate case study

HuntersGate

The new system is made up of 5 Ecodan® CAHV 43kW air source heat pumps, together providing over 200kW of heating.

Irish World Heritage Centre case study

Irish World Heritage Centre

This new system uses a Mitsubishi Electric Ecodan® CAHV heat pump to provide hot water to the Centre’s underfloor heating.

St Mungo’s case study

St Mungo’s

St Mungo’s, a charity based mainly in London and the South, fits air source heat pumps to their new London flats.

Tuckwell Showroom case study

Tuckwell Showroom

P. Tuckwell decided to have their showroom fitted with the Ecodan CAHV Renewable Heating Solution from Mitsubishi Electric.

Woolley Wood case study

Woolley Wood

The new heating and hot water system uses six Mitsubishi Electric Ecodan® CAHV-P500YA-HPB monobloc air source heat pumps.

Mitsubishi Electric Europe
Heating Systems Division
Travellers Lane
Hatfield
Hertfordshire
AL10 8XB

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
  • Validation