- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

Mitsubishi Electric - Air Conditioning Case Studies

Click on the links below to read more information about a case study:

Alfa Laval case study

Alfa Laval, Surrey

5 new City Multi YHM-R2 Replace technology systems now provide simultaneous heating & cooling over the top 2 floors of the building.

Chapelford primary school case study

Chapelford Primary School, Warrington

Mr Slim units supply cooling to the school’s offices using the ozone-friendly refrigerant R410A.

The Connells Group case study

The Connells Group

The project quickly became a true, three-way collaboration between ACS, Mitsubishi Electric and The Connells Group.

The Co-operative case study

The Co-operative, Dagenham

Refurbishment of the current heating and cooling system in the Co-operative’s food store in Dagenham.

Heyn Handling case study

Heyn Handling, Belfast

Air Cool suggested a simple, cost-efficient but effective upgrade using Mitsubishi Electric’s Replace technology.

The Logic Group case study

The Logic Group, Fleet

Mitsubishi Electric’s City Multi YJM Replace Multi units were selected as the most cost-effective way to replace the existing units.

Premier Inn case study

Premier Inn, London Kings Cross

The system is operated by Mitsubishi's centralised controller, Melcotel™, designed specifically for use in the hotel sector.

VolkerFitzpatrick case study

VolkerFitzpatrick, Hoddesdon

Mitsubishi Electric’s City Multi WR2 ground source heat pump condensing units now provide heating and cooling for the building.

Mitsubishi Electric Europe
Heating Systems Division
Travellers Lane
Hatfield
Hertfordshire
AL10 8XB

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
  • Validation