- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

FRENGER Systems - Case Studies

Click on the links below to read more information about a case study:

Frenger's order value was £7.6 million for the supply and installation of 4500 active multiservice chilled beams.

Frenger’s Active Multiservice Chilled Beams - part of the £35 million re-development at the Cambridge University Campus.

Domino’s Pizza’s new HQ Six Million pound design and build contract,  utilising Frenger’s “Radiant”  (MSCB’s).

Frenger were delighted to be specified for the supply of the “Radiant“ Passive MSCBs for the new UCB.

110 High Holborn offer 40,000 sq ft of high quality office space in the heart of midtown, london’s new creative hub.

Frenger supplied highly efficient Active Multiservice Chilled Beams (MSCBs) to this heritage style building.

The extensive refurbishment of 101 New Cavendish Street has been a most impressive and distinguished project.

London, UK - Active Multiservice.

London, UK - Active Multiservice.

Frenger are proud to have been chosen for the design, supply & installation of passive multiservice chilled beams.

London, UK - Passive Multiservice.

Visit Frenger System's website to view .

Frenger Systems Limited
Riverside Road
Pride Park
Derby
Derbyshire
DE24 8HY

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
  • Validation