- BuildingDesign Construction Portal
  • Request Product Information

Component Developments - Case Studies

Click on the links below to read more information about a case study:

Leigh Sports Village

Component Developments worked with Rokbuild to develop shower and changing areas drainage solution.

Pfizer Pharmaceuticals

For the Kent plant, Component Developments were approached to provide drainage to dispose of their liquid waste.

Domino's Pizza Group

The drainage system needed to meet FDA requirements, be easy to clean, durable and able to keep up with hydraulic requirements.

Naturediet Pet Food

The stainless steel drainage channel is suitable for a resin floor finish, and includes a removable waste basket to catch debris.

Tilmanstone Salads

Working with Flordeck to design, manufacture & supply a drainage solution that meets all FDA hygiene & hydraulic requirements.

Rathfinny Winery

The new state-of-the-art winery is energy self-sufficient, with a grass roof, solar panels and a water treatment facility.

Green Park Tube Station

A system needed to be designed that could withstand the weight of commuters walking over the drainage channels every day.

Four Pure

Working with Flordeck to create a drainage solution able to withstand the large amounts of wastewater created by brewing.

New Beacon School

Component Developments designed, manufactured & supplied the stainless steel drainage systems for a sports refurbishment.

Anspach and Hobday Brewery

Working with Flordeck to design and manufacture a stainless steel channel into the Anspach and Hobday Brewery.

McCain Foods Limited

A variety of solutions were implemented including stainless steel kerbing, 4 heavy duty gullies and a large network of channels.

Fitness First

Component Developments was adopted as the standard for all Fitness First new builds and refurbishments since 2001.

More London

The “More London” project is a development which is re-shaping the London skyline introducing offices, shops, cafes and restaurants.

The Francis Crick Institute

C&C Catering required stainless steel drainage for the canteen kitchen. Component Developments used their Vinoseal range.

Tate Modern

The museum's underground pipework, kitchen plan and tiled flooring was accounted for when designing the drainage systems.

H.M. Prison Hull

3 channel systems in the kitchen were designed with an expansion angle specifically to suit the area’s wash down requirements.

University College London Hospital

The project covered an area of 7,500 sq m, supplying 78 manhole covers, 60m of hydrotherapy pools channels & anti-slip gratings.

Cheesegrater

The Leadenhall Building, yet another impressive skyscraper to occupy the view above central London, has been fitted...

Cafe Royal

World famous hotel - Cafe Royal, originally conceived in 1865 by french wine merchant Daniel Nicholas Thévenon, has undergone...

1Rebel

Component Developments supplied drainage channels for a new, stylish, pay-as-you-train boutique in the city.

Aldgate Tower

Adgate Tower is a state-of-the-art 317,000 square foot headquarters building at the heart of the commercial quarter of...

Park Chinois

The Park Chinois is an ambitious restaurant located on Berkeley street, London W1. The Mayfair property, which formerly housed...

Albion Riverside

Situated alongside the River Thames, Albion Riverside was designed by Foster and Partners for client Hutchinson Whampoa...

Facebook

Facebook, one of the worlds best known brands, occupies 87,719 sq ft of space at its London, Brock Street address.

Ropemaker Place

Covering an area of 609,775 sq ft, Ropemaker is a commercial building situated on a prominent city island close to Moorgate...

Sainsbury's

Sainsbury's, which boasts more than 24 millions transactions per week across it's 1,200 stores, is one of the best known names...

Component Developments Logo

Component Developments
Halesfield 10
Telford
Shropshire
TF7 4QP

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
  • Validation